With Fénix we seek to continue meeting the country's energy needs, producing gas in the southernmost offshore reserve in the world. 

The project consists of the construction and installation of a production rig that will connect 3 natural gas producing wells. These wells will be drilled 60 km offshore Tierra del Fuego in a 70 meter water depth. 

Production from Fénix will be transported through a gas pipeline which will connect to the Vega Pléyade offshore rig. The gas will be processed and conditioned at the Río Cullen plant and will then be injected in the San Martín gas pipeline.

It is estimated that Fénix will contribute up to 10 million cubic meters of gas per day to supply the domestic market, representing approximately 8% of the country's current gas production.

mapa-fenix_eng
mapa-fenix_eng

Pioneering offshore production for the past 44 years

Our history in Argentina dates back to 1978 in Tierra del Fuego, with the signing of an offshore exploration contract by the Cuenca Marina Austral 1 (CMA-1) Consortium operated by Total Austral (37.5%) and formed by Wintershall Dea Argentina (37,5%) and Pan American Sur (25%).

Only 9 years later, and after a complex offshore exploration work, we were able to drill more than 45 exploration and delineation wells with a success rate of more than 80%. 

Today, the following offshore fields are in production: Hidra, Kaus, Ara-Cañadón Alfa, Carina, Aries and Vega Pléyade. Production is treated at the onshore Río Cullen and Cañadón Alfa plants, north of Tierra del Fuego island. 

Together, these fields supply close to 19 million cubic meters of gas to the Argentine market on a daily basis. This shows our permanent commitment to satisfy Argentina's growing energy demand, guaranteeing the economic and sustainable development of natural resources, respecting high safety and environmental preservation standards and strengthening our long-term commitment to provide better, safer and lasting energy. 

icon play

Total_VideoFenix

Our offshore experience is supported by our ambitious projects

  • Hidra, our first offshore field in Argentina and the southernmost in the world. This project, which dates back to 1989, highlighted Total Austral's ability to manage large, innovative projects and to position as a pioneer and leader in the Argentine energy industry. 
  • Long-reach well drilling campaign. In early 1997, we developed an ambitious and challenging drilling campaign aimed at producing offshore reserves through long-reach wells drilled offshore Tierra del Fuego. In 1999, Total Austral completed this 11 horizontal well drilling campaign, also breaking a world record for length drilled with the CN-1 well (11,184 m) and with a depth of 1,690 m. 
  • Argentina's first subsea wells: Argo 1 and 2. In 1999, to develop the Argo gas field, located 20 kilometers offshore and 80 meters of water depth, we chose an innovative scheme: we installed two subsea wellheads, Argo 1 and 2, connected by a 12.7 km set of subsea lines to the Hidra Centro rig and remotely operated from the Rio Cullen plant.
  • Carina-Aries and Vega Pléyade, our latest large-scale projects. We brought the Carina-Aries and Vega Pléyade offshore fields into production in 2005 and 2016, showing our commitment to further develop the world's southernmost gas reserves. The Carina-Aries and Vega Pléyade rigs are connected to the Río Cullen treatment plant through a network of subsea pipelines 87 and 72 kilometers long, respectively.
     

 

Our principles of action

More about TotalEnergies in Argentina